Home / Field readiness

Field readiness for USA inspectors

Download PDF

For inspectors at companies in the Underwriter Services Association network, after the LCA course and before a trainer puts you on the street.

LCA does not guarantee work. Underwriter Services Association is a recruiting network of 20+ inspection companies. The company that hires you still decides when you take files.

What this is

USA member companies use LCA as shared baseline training. More than twenty inspection companies sit in that network. You finish four chapters, the videos, and the quizzes at 80 percent. Then the company trainer reviews protocol, photos, time service, and revisions before you get assignments.

LCA certification is not field approval. Company protocol decides who takes work.

How to use it in the field

You document what you can see for an underwriter. You are not an engineer, electrician, or code official unless the assignment says you are.

Write what you saw. If you cannot see it, write that you could not see it. In the field you look, take the photo, write the note, and recommend a practical next step.

A weak line is "Panel blocked. Clear it." A file that survives QA reads more like this: Federal Pacific Stab-Lok in the warehouse electrical room, storage stacked against the dead-front, photo 14. Someone who has to kill power in a hurry cannot get to the panel, and this brand is a known fire concern. Tell the insured to keep the dead-front clear and have a licensed electrician evaluate it.

Read the request before you call. Occupancy on the form is a starting point. Verify operations on site. Property walks follow COPE. Liability walks follow people-paths. Package is both.

County and public-record lookup

Before you leave, or from the parking lot if you are already on site, look up the parcel on the county assessor, property appraiser, or GIS site that serves that address. Use the official public search the county publishes. Do not scrape, automate, or collect records beyond what the assignment needs.

Typical public fields that help a survey:

Public records support a class and occupancy story. They do not replace the photo. Hidden assemblies stay unseen. If the county site is down, the parcel is unclear, or the record and the building disagree, write that and photograph what you could see.

Pre-arrival, occupancy, and COPE

Before you call

Inspection companies use different portals. Most requests still carry the same working fields: insured name, location, contact, report type, coverage, occupancy or risk type, due date, client notes, special instructions, required photos, and supplements. Review those before the first call. Unclear request information should be clarified, not guessed.

Introduce yourself by name and inspection company, working on behalf of the carrier or client, and name the agency when you have it. Document each contact attempt with date, method, and result. Follow company time-service rules.

On arrival

Confirm the contact, explain the purpose, and start with open-ended questions. Then walk. Photos do not replace what the contact can tell you about operations, who is responsible for a hazard, and what happens off premises.

Occupancy is what the business actually does here, not the DBA, class code, or request line. Ask about on-premises versus jobsites, subcontractors, delivery, occupant count, and amenities. "Restaurant" on the form can be catering, banquet, and a fryer line on site.

COPE

C.O.P.E. is Construction, Occupancy, Protection, and Exposures. Use it to organize property information the underwriter can rate.

Exterior and construction class

Walk the exterior in order: front, sides, rear. Repeat for each building. Photograph roof material and, when you can see it, roof construction. Note drainage, openings, siding, and surrounding condition.

ISO construction class is a field identification of visible building elements. Class is walls, floors, and roof. Do not assign a better class from interior finish. Do not invent fire-resistance hour ratings or mixed-construction wall-area percentages. If you cannot confirm the class, say so.

Class Field ID
1 Frame Combustible walls and roof. Wood or similar framing at eaves or openings. Windows often sit flush with a light wall.
2 Joisted Masonry Masonry or concrete-block walls with combustible floor or roof framing. The underside of the roof or a lifted ceiling tile often tells the story.
3 Noncombustible Metal or other noncombustible walls and roof. Typically steel framing and metal deck.
4 Masonry Noncombustible Masonry walls with a noncombustible roof and floors: steel, concrete, or metal deck.
5 Modified Fire Resistive Heavier protected assemblies than Class 4. Identify from visible structure, not from a guessed hour rating.
6 Fire Resistive Substantial concrete or protected steel you can see. Do not assign this class from a lobby finish.

Prove class with an underside-of-roof photo of support and decking, or write that a finished ceiling blocked the view and no tile could be lifted safely. Take an exterior wall close-up that lets QA tell masonry from veneer or metal skin. Public records may support the story. They still do not replace those photos.

Keep the 6 ISO Construction Classes Field ID Card in the truck. Construction class is also covered in the Building Construction chapter.

Roof, electrical, HVAC, and plumbing

Roof

Separate roof covering from roof construction. Covering is the material you see from the ground or a safe vantage: shingle, tile, metal, membrane, built-up. Construction is the support system: rafters, trusses, joists, purlins, steel, wood, or concrete deck.

Note shape (gable, hip, flat, mansard, shed), drainage, ponding, flashing, penetrations, edges, and visible damage. Flat and low-slope roofs need a closer look at seams and drains. Roof shape can change wind uplift. Photograph material, condition, and any issue you will mention in the report.

Electrical (observe only)

Do not open the interior or touch conductors. Open the panel door if you can do it safely. Photograph the brand tag, model, and date code so someone can read them later. Photograph the breaker row. Two photos for every panel: breakers or openings, and the label.

Look-fors from the course and Field ID Cards:

You are documenting visible facts. Recommend a licensed electrician when the brand, date code, or condition is a concern. Do not certify a panel as safe because the door closed neatly. See the Electrical Panel Field ID Card, the Square D QO recall card, and the Electrical Panels Requiring Attention Guide.

HVAC

Identify the system you can see: central, mini-split, rooftop or package unit, cooling tower, chiller. Note visible condition, corrosion, damage, clearance, rooftop securement, condensate drainage, and ductwork. A rooftop unit that is not secured is a movement and roof-damage exposure. Photograph the unit and any issue you will write.

Plumbing

Water you can see. Water heaters and boilers: condition, corrosion, leaks, pressure-relief valve and discharge piping, installation concerns. Piping, valves, drainage, and signs of prior water damage. Connected appliances when the connection can leak. Photos should show the equipment, the leak or corrosion, and any service tag that is present.

Life safety and fire protection

Observe means of egress, exit discharge, emergency lighting, exit signs, extinguishers, alarms, and sprinklers when they are present. Photograph service tags so the date is readable. Extinguisher tags are commonly expected within one year. Hood cleaning and suppression dates follow the assignment and the posted tag, not a guess.

Know the difference between what you observe and inspection, testing, and maintenance (ITM). You record whether a system is present, whether tags look current, and whether access or condition is a problem. You do not certify that a sprinkler system passed its last ITM unless the assignment asks for a document you were given and can photograph.

Commercial cooking: photograph the kitchen, appliances, hood interior, filters, nozzles, drip tray, hood service tag, suppression tag, and K-type extinguisher tag. Use the Cooking Hood Protection Field ID Card and the Restaurant Fire Safety Guide.

More on extinguishers and sprinklers: Fire Extinguisher Safety Guide and Fire Sprinkler System Inspection Guide.

Passive protection is built into the structure: rated walls and doors, compartmentation, fire stopping, storm openings. Active protection must operate or be used: sprinklers, alarms, extinguishers, hood systems, emergency lights. Describe both factually.

Premises liability, pools, and spas

Liability files follow people-paths: walkways, stairs, ramps, railings, parking, lighting, housekeeping, mats, entrances, and exits. Photograph the close-up condition and enough context to show where it is.

If a pool or spa is on the premises, treat it as its own amenity. Course field points: barrier height, self-closing childproof-latched gate, VGBA drain covers, life-saving equipment, rules, depth marks, and deck condition. Call out diving boards and slides. Hot-tub timers and soak limits when present. Photograph visible drain covers. Missing, cracked, loose, or unsecured covers are a finding. Do not certify VGBA compliance unless the assignment says you are qualified to do that.

Use the Community Pool Safety Field ID Card and the Commercial Pools and Spas Safety Guide.

Photos, notes, and the report

Review required photos before you arrive. Missing photos cause revisions.

Date-label photos only help if the date is in focus. Notes should match the photos. If you recommend a correction, the file should show the condition that caused it.

Package files combine property and general liability. Garage files need operations, whose vehicles, who drives, key control, lot security, and flammables. For each finding you keep, write what you saw, why it matters, and what to do.

When someone is field ready

A field-ready inspector can do this without a trainer at the keyboard:

  1. Read the request before calling, and treat occupancy as unverified.
  2. Walk the risk in coverage order.
  3. Prove construction and occupancy with photos.
  4. Write what you saw, why it matters, and what to do, or write what you could not see.

If those are not there, the applicant is not field ready. That is a coaching result, not a job decision from LCA. Final approval for assignments stays with the inspection company.

This page does not replace company procedures, client instructions, carrier requirements, regulations, or professional judgment.

Field ID Cards

Quick-reference cards live in Resources. They help you recognize a condition and know which photos to take. They do not replace protocol.

The LCA course is four chapters, video lessons, a quiz after each lesson, and a printable reference guide. Pass at 80 percent. Then your inspection company still runs trainer review. View the course.