Owners and Contractors Protective (OCP) Field Inspection Worksheet

Field worksheet documenting project scope, contractor insurance, owner exposures, site hazards, protection controls, and report-ready notes.

Project / Insured Information

Insured / Named Owner
Contact / Title
Phone / Email
Inspection Date
Project Location / Address
Project Type — New / Renovation / Repair
Insured Role — Owner / Lessee / Tenant
Building Stories / Construction
Total Project Cost ($)
Contracted Cost ($)
Start Date
Target Completion Date
Scope of Work / Project Description
Underwriting Focus — Scope / insured role

Identify what work is being performed, who owns or controls the site, and the insured’s relationship to the contractor. Record the project value and contracted cost; do not assume OCP insurance replaces contractor GL.

Contractor / Agreement Controls

General Contractor / Contractor Name
License Number / State
Contractor GL Insurance — Verified?
Workers Compensation — Verified / Exempt / Unknown
Certificate of Insurance — Obtained / Pending
Contractor Policy Limits / Expiration
Hold-Harmless / Indemnity Agreement — Yes / No / Unknown
Contract / Permits / Documents Reviewed
Contractor Insurance / Agreement Notes
Underwriting Focus — Contractual protection

Request confirmation of contractor GL, workers compensation, certificates and agreements as applicable. A COI does not guarantee coverage; report what was actually provided or verified, including unavailable information.

Building / Site Conditions & Exposures

Existing Building / Site Condition
Occupied During Work? — Yes / No
Building / System Updates if Applicable
Adjacent Occupancy / Public Access
Known Hazards — Asbestos / Lead / Excavation / Utilities / Roof
Openings / Trenches / Uneven Surface Controls
Unusual Hazards / Observed Exposures
Underwriting Focus — Site hazards

Identify excavation, heights, temporary work, active utilities, occupied adjacent areas, pedestrian access and existing structure exposures. Photograph visible conditions and distinguish observation from contact-reported information.

Safety / Fire / Security Controls

PPE / Safety Practices
Fall Protection / Barricades / Signs
Scaffolds / Lifts / Public Separation
Hot Work / Permit / Fire Watch
Fire Extinguishers / Fire Prevention
After-Hours Fencing / Locked Gates
Site Lighting / Cameras / Guard
Housekeeping / Combustible Debris
Site Controls / Protection Notes
Underwriting Focus — Fire and public protection

Check hot-work controls and fire extinguisher availability; assess access restrictions and protection of the public from active construction. Do not indicate controls are in place unless seen or reliably reported.

Materials / Equipment / Utilities / Waste

Material Storage — Secured / Weather Protected
Equipment / Machinery On Site
Temporary Electrical — Present / Protected
Utilities Modified — Electric / Water / Gas / Sewer
Office Trailer — Present / Not Present
Waste / Dumpster / Hazardous Disposal Method
Storage / Utilities / Waste Notes

Loss History / Additional Underwriting Notes

Prior Site Incidents / Losses — Yes / No
Reported Loss Types / Dates
Additional Underwriting Observations

Photos to Obtain

Photograph all observed recommendations and underwriting concerns. Obtain close-ups of the condition and relevant identifying information.

Front / address / project signAll sides / site overviewProject scope / phase of workContractor materials / equipmentFencing / gates / warning signsHot work / fire extinguishersElectrical service / panels / labels if accessibleUtilities / temporary electricalWaste / housekeepingRoof or excavation work where applicablePublic / adjacent exposuresAll recommendation hazards (close-up required)

Narrative Insert

The insured is the owner / lessee / tenant of the ____ story ____ construction building or project located at ____. Work consists of ____ with a total estimated project cost of $____ and contracted cost of $____. Work began / is scheduled to begin on ____ and is expected to finish on ____.

The general contractor is ____ (license ____). Contractor GL and workers compensation coverage were ____ verified; proof of insurance was ____. Hold-harmless or indemnification agreements were ____; documents reviewed included ____.

The existing structure / site condition is ____. The project involves ____ and adjacent / public access exposures of ____. Safety, fire prevention, hot-work and site security controls consist of ____.

Materials and equipment are stored ____. Temporary electrical and other utility changes consist of ____. Waste is removed by ____. An office trailer is ____ present. Additional observed concerns include ____. The contact reported ____ prior site incidents or losses.

Recommendations: