Building Valuation (BV-RCE) Field Module

Purpose: Supplemental RCE information for Building coverage (including Package). One worksheet per building. Collect when “Need BV” appears on the request.

Not saved. Data stays in this browser until you Save Draft to Device.

1. Coverage / basic building information

Collect BV information for Building-only or Package coverage that includes the Building. For BPP/Contents-only, it is not required. If uncertain, collect it anyway.

Coverage shown under Special Comments / “Need BV”

Building only Package — Building included BPP / Contents only Unsure / Need BV — collect details

Check the request for “Need BV” or coverage under Special Comments.

Building / insured name
 
Building address
 
Building age (years)
Enter age or an estimate supported by records/contact.
 
Year built (if known)
 
Building area (total sq. ft.)
Use gross BUILDING area; not site acreage.
 
Number of stories
 

2. Exterior wall shell / cladding

Estimate the percentage of ALL exterior wall covering by material. Identify what each finish is installed over (substrate), where reasonably verified.

Wall covering / material%Installed over / substrateLocation (if different)
Cladding 1
 
% of exterior walls
 
Over / substrate
 
Wall location
 
Cladding 2
 
% of exterior walls
 
Over / substrate
 
Wall location
 
Cladding 3
 
% of exterior walls
 
Over / substrate
 
Wall location
 

Exterior-wall percentages: enter the portions you can verify (target total: 100%).

Exterior finish / substrate notes
 

3. Occupancy, heating and air conditioning

Occupancy-use percentages and conditioned-area percentages are separate breakdowns. Each is based on TOTAL building floor area.

Occupancy / use% of building
Use 1
 
% of total area
 
Use 2
 
% of total area
 
Use 3
 
% of total area
 

Occupancy percentages: target total 100%.

Heated and/or air-conditioned area (%)
 
Unconditioned / non-AC area (%)
 
Conditioned space use
 
Non-AC space use
 
Type of heating
 
Type of cooling
 

Conditioning percentages: target total 100%.

4. Interior finishes (finished sections)

For each different finished area, record FLOORING, WALL and CEILING finish; do not confuse the decorative ceiling with the roof structure.

Finished area 1
 
Area % (if different)
 
Floor material
 
Wall material
 
Ceiling material
 
Finished area 2
 
Area % (if different)
 
Floor material
 
Wall material
 
Ceiling material
 
Finishes / other areas notes
 

5. Required photographs

Clear representative photos must substantiate the wall covering, flooring and ceiling materials described in the BV paragraph.

Front and remaining elevations showing wall finishesClose-up of EACH distinct wall covering / claddingREQUIRED: Flooring in each finished sectionREQUIRED: Ceiling finish/type in each finished sectionInterior wall finish (representative)Photo identifying office vs. warehouse / non-AC area
Photo reference numbers / unavailable photos
 

6. Narrative insert — separate BV paragraph

Click Generate BV Info to prepare the required stand-alone paragraph. Review and edit the wording before placing it in your inspection narrative.

BV Info: The building is approximately ___ years old and contains ___ sq. ft. of building area. The building’s shell wall covering is ___% ___ over ___ and ___% ___ over ___. The design has ___% air-conditioned ___ space and ___% non-AC ___ space. The flooring in the ___ section is ___, walls are ___ and the ceiling is ___.
See MGA example — separate BV paragraph

BV Info: The building’s shell wall covering is 75% stucco over concrete block and 25% Hardie Board on the front side. The design has 25% air conditioned office space and the remaining area is non AC warehouse space. The flooring in office section is vinyl tile, walls are sheetrock and the ceiling is acoustical tile.

Inspector notes / exceptions

Only use this area for useful clarifications, missing information or discrepancies.

Additional field notes
 
Inspector field guide — finishes and percentages

Exterior wall finish: specify both the covering and what is underneath when known. Example: “75% stucco over concrete block; 25% Hardie Board over wood framing.” If substrate cannot be confirmed, record that rather than guessing.

Interior floors: vinyl composition tile (VCT), carpet, laminate/LVP, ceramic tile, bare or polished concrete. Walls: drywall/sheetrock, CMU/block, wood paneling. Ceilings: acoustical/drop tile, drywall, exposed roof deck/structure.

Different percentages: cladding uses exterior WALL area; occupancy and conditioning use TOTAL building FLOOR area. Document estimates and their source.

Related LCA reference: 6 ISO Construction Classes Field ID Card

Building Valuation (BV-RCE) Field Module – LossControlAcademy.com